← All prompts

πŸ’¬ CAPA Email After Failed Inspection

Drafts a formal CAPA request email from a failed AQL finding list, asking for root cause, corrective and preventive actions with evidence due dates β€” not a casual sample note.

Sourcing & supplier verificationIntermediate Β· Edit variables or configuration before use.FreePublished Nov 3, 2026
Tested onβœ“ Geminiβœ“ DeepSeekSee test log

The prompt

You help a buyer write a formal Corrective and Preventive Action (CAPA) request after a failed outgoing or pre-shipment inspection. This is not sample feedback and not a soft factory-visit note. Keep it professional and specific.

Factory / supplier: {{supplier_name}}
Attention: {{contact_name}}
Inspection type and date: {{inspection_meta}}
AQL / sampling plan used (as recorded): {{aql_plan}}
Failed findings (paste inspector notes; keep codes if any):
{{failed_findings}}
Order / SKU reference: {{order_ref}}
Evidence due date for the CAPA reply: {{capa_due}}
My company sign-off name: {{buyer_name}}

Write:
1. Subject line that names the order/SKU and says "CAPA request β€” failed inspection".
2. A formal email in clear English (short sentences; fine for ESL readers):
   - One-sentence context: which inspection failed and against which AQL plan (use only my meta).
   - A numbered CAPA request for EACH failed finding with four required reply fields:
     a) Root cause (why it happened in process / material / training β€” they must fill this; do not invent one)
     b) Corrective action (fix this lot / this shipment)
     c) Preventive action (stop recurrence on future lots)
     d) Evidence and due date (photo, re-inspection record, revised WI, training record β€” pick only what fits the finding; due = {{capa_due}} unless I stated otherwise per finding)
   - State that shipment / acceptance stays on hold until CAPA evidence is accepted (only if that matches common practice; do not invent penalties or legal claims).
   - Ask them to reply in a table matching the structure below.
3. A blank reply table in Markdown for them to fill:
   | Finding # | Root cause | Corrective action | Preventive action | Evidence | Owner | Due |
4. A short internal checklist for me: which findings need a re-pull / re-inspect before I can clear the lot, based only on the failed list.

Rules:
- Use only findings I pasted. Do not add defect types, standards, certificate names or fail rates I did not give.
- If a finding is vague, keep the wording and require the factory to clarify in the root-cause cell β€” do not guess the defect.
- This is an operational quality email, not legal advice. Do not threaten lawsuits or cite regulations I did not mention.

Variables

Replace each {{name}} before you send the prompt.

VariableWhat to put inExample
{{supplier_name}}Factory or supplier company name.Ningbo Example Housewares Co., Ltd
{{contact_name}}Quality or sales contact receiving the CAPA.Mr. Chen (QA)
{{inspection_meta}}Inspection type and date.Pre-shipment inspection, 1 November 2026, third-party inspector
{{aql_plan}}AQL / sampling plan as recorded on the report.ISO 2859-1, Level II, AQL Critical 0 / Major 2.5 / Minor 4.0; lot size 5000; sample 200
{{failed_findings}}Paste failed findings from the AQL report.Major: 8/200 units with handle stitch open >5mm (fail vs AQL 2.5). Major: 3/200 units wrong carton barcode vs packing list. Minor: 12/200 units light scratch on matte glaze (over AQL 4.0). Critical: none.
{{order_ref}}PO / SKU reference.PO-2026-1188 / SKU MUG-12-WHT
{{capa_due}}When you need the CAPA reply and evidence.7 November 2026
{{buyer_name}}Your sign-off name.Jordan Lee, Acme Imports LLC

Example

INPUT
supplier_name: Ningbo Example Housewares Co., Ltd
contact_name: Mr. Chen (QA)
inspection_meta: Pre-shipment inspection, 1 November 2026, third-party inspector
aql_plan: ISO 2859-1 Level II, AQL 0 / 2.5 / 4.0; sample 200 of 5000
failed_findings: (majors and minor as in the example above)
order_ref: PO-2026-1188 / SKU MUG-12-WHT
capa_due: 7 November 2026
buyer_name: Jordan Lee, Acme Imports LLC
OUTPUT
### 1. Subject Line

**CAPA request β€” failed inspection: PO-2026-1188 / SKU MUG-12-WHT**

***

### 2. Formal Email

**To:** Mr. Chen (QA), Ningbo Example Housewares Co., Ltd  
**From:** Jordan Lee, Acme Imports LLC  
**Date:** 2 November 2026  
**Subject:** CAPA request β€” failed inspection: PO-2026-1188 / SKU MUG-12-WHT  

Dear Mr. Chen,

On 1 November 2026, the third-party pre-shipment inspection for PO-2026-1188 (SKU MUG-12-WHT; lot size 5,000; sample size 200) failed against ISO 2859-1, Level II, AQL Critical 0 / Major 2.5 / Minor 4.0.

Shipment acceptance and dispatch are on hold until we receive, review, and formally accept your completed CAPA and supporting evidence.

Please review the failed findings below and provide a specific response for each:

#### Finding 1 (Major)
**Inspector note:** 8/200 units with handle stitch open >5mm (fail vs AQL 2.5).  
* **a) Root cause:** Identify why this defect occurred (process, material, or operator training).  
* **b) Corrective action:** State your 100% sorting and rework/replacement plan for this 5,000-unit lot.  
* **c) Preventive action:** State the specific process control or standard update to prevent this on future runs.  
* **d) Evidence and due date:** Submit sorting/rework records, defect photos, and revised Work Instructions (WI) or training records by **7 November 2026**.

#### Finding 2 (Major)
**Inspector note:** 3/200 units wrong carton barcode vs packing list.  
* **a) Root cause:** Identify why incorrect barcodes were applied or printed against the packing list.  
* **b) Corrective action:** State how 100% of the shipping cartons in this lot will be checked and re-labeled.  
* **c) Preventive action:** State the verification step added to your packing/labeling process to stop barcode mismatches on future…

Real, unedited output from a test run on Nov 3, 2026 Β· Gemini Β· model gemini-flash-latest.

Full output Β· Gemini (gemini-flash-latest)
### 1. Subject Line

**CAPA request β€” failed inspection: PO-2026-1188 / SKU MUG-12-WHT**

***

### 2. Formal Email

**To:** Mr. Chen (QA), Ningbo Example Housewares Co., Ltd  
**From:** Jordan Lee, Acme Imports LLC  
**Date:** 2 November 2026  
**Subject:** CAPA request β€” failed inspection: PO-2026-1188 / SKU MUG-12-WHT  

Dear Mr. Chen,

On 1 November 2026, the third-party pre-shipment inspection for PO-2026-1188 (SKU MUG-12-WHT; lot size 5,000; sample size 200) failed against ISO 2859-1, Level II, AQL Critical 0 / Major 2.5 / Minor 4.0.

Shipment acceptance and dispatch are on hold until we receive, review, and formally accept your completed CAPA and supporting evidence.

Please review the failed findings below and provide a specific response for each:

#### Finding 1 (Major)
**Inspector note:** 8/200 units with handle stitch open >5mm (fail vs AQL 2.5).  
* **a) Root cause:** Identify why this defect occurred (process, material, or operator training).  
* **b) Corrective action:** State your 100% sorting and rework/replacement plan for this 5,000-unit lot.  
* **c) Preventive action:** State the specific process control or standard update to prevent this on future runs.  
* **d) Evidence and due date:** Submit sorting/rework records, defect photos, and revised Work Instructions (WI) or training records by **7 November 2026**.

#### Finding 2 (Major)
**Inspector note:** 3/200 units wrong carton barcode vs packing list.  
* **a) Root cause:** Identify why incorrect barcodes were applied or printed against the packing list.  
* **b) Corrective action:** State how 100% of the shipping cartons in this lot will be checked and re-labeled.  
* **c) Preventive action:** State the verification step added to your packing/labeling process to stop barcode mismatches on future shipments.  
* **d) Evidence and due date:** Submit 100% carton check records and clear photos of the corrected carton barcodes by **7 November 2026**.

#### Finding 3 (Minor)
**Inspector note:** 12/200 units light scratch on matte glaze (over AQL 4.0).  
* **a) Root cause:** Identify at what stage the matte glaze scratches occur (handling, tooling, firing, or packing).  
* **b) Corrective action:** State your sorting and replacement plan for scratched units in this lot.  
* **c) Preventive action:** State handling, tooling, or packaging adjustments to protect the matte glaze on future lots.  
* **d) Evidence and due date:** Submit sorting logs, photos of acceptable replacement goods, and updated handling instructions by **7 November 2026**.

Please fill out your response in the table format provided below and return it with all required evidence attachments by **7 November 2026**.

Best regards,  

**Jordan Lee**  
Acme Imports LLC  

***

### 3. Blank CAPA Reply Table

| Finding # | Root cause | Corrective action | Preventive action | Evidence | Owner | Due |
|---|---|---|---|---|---|---|
| **1** (Major: handle stitch open >5mm) | *(Factory to fill)* | *(Factory to fill)* | *(Factory to fill)* | *(Photos, sorting report, revised WI/training)* | *(Factory to fill)* | 7 Nov 2026 |
| **2** (Major: wrong carton barcode vs packing list) | *(Factory to fill)* | *(Factory to fill)* | *(Factory to fill)* | *(Photos of corrected labels, 100% scan/check log)* | *(Factory to fill)* | 7 Nov 2026 |
| **3** (Minor: light scratch on matte glaze) | *(Factory to fill)* | *(Factory to fill)* | *(Factory to fill)* | *(Sorting log, photos, handling WI)* | *(Factory to fill)* | 7 Nov 2026 |

***

### 4. Internal Buyer Checklist (Pre-Release Clearance)

Before releasing this lot for shipment, verify the following based strictly on the failed findings:

- [ ] **Handle stitch open >5mm (Major):** Requires an on-site sample re-pull / re-inspection under ISO 2859-1 Level II to verify open stitches are within AQL 2.5 acceptance numbers following the factory's 100% sort.
- [ ] **Wrong carton barcode vs packing list (Major):** Requires visual/scanner verification on a sample of master cartons to confirm barcodes match the packing list before approving container loading.
- [ ] **Light scratch on matte glaze (Minor):** Requires re-inspection during the re-pull to verify that minor glaze scratches fall within the AQL 4.0 threshold after the factory sorts the lot.
Full output Β· DeepSeek (deepseek-flash)
**Subject:** CAPA request β€” failed inspection β€” PO-2026-1188 / SKU MUG-12-WHT

**To:** Mr. Chen (QA), Ningbo Example Housewares Co., Ltd  
**From:** Jordan Lee, Acme Imports LLC

Dear Mr. Chen,

The third-party pre-shipment inspection on 1 November 2026 for PO-2026-1188 / SKU MUG-12-WHT failed against the recorded ISO 2859-1 Level II plan with AQL Critical 0 / Major 2.5 / Minor 4.0, lot size 5,000 and sample 200.

Please provide a CAPA reply for each failed finding below. For each finding, complete all four fields: root cause, corrective action, preventive action, and evidence with due date. The CAPA evidence is due on 7 November 2026. The root cause must explain why the issue happened in process, material, or training. Do not leave it blank. If any finding wording is unclear, clarify it in the root-cause cell.

**1. Major: 8/200 units with handle stitch open >5mm (fail vs AQL 2.5).**
a) Root cause: [Factory to complete β€” explain why it happened in process / material / training.]  
b) Corrective action: [Factory to complete β€” action to fix this lot / this shipment.]  
c) Preventive action: [Factory to complete β€” action to stop recurrence on future lots.]  
d) Evidence and due date: [Factory to complete β€” provide evidence that fits the finding, such as photos of affected/reworked units, re-inspection record, revised work instruction or training record where relevant; due 7 November 2026.]

**2. Major: 3/200 units wrong carton barcode vs packing list.**
a) Root cause: [Factory to complete β€” explain why it happened in process / material / training. Clarify the barcode/carton issue.]  
b) Corrective action: [Factory to complete β€” action to fix this lot / this shipment.]  
c) Preventive action: [Factory to complete β€” action to stop recurrence on future lots.]  
d) Evidence and due date: [Factory to complete β€” provide evidence that fits the finding, such as corrected carton barcode photos, packing-list match record, re-inspection record, revised work instruction or training record where relevant; due 7 November 2026.]

**3. Minor: 12/200 units light scratch on matte glaze (over AQL 4.0).**
a) Root cause: [Factory to complete β€” explain why it happened in process / material / training.]  
b) Corrective action: [Factory to complete β€” action to fix this lot / this shipment.]  
c) Preventive action: [Factory to complete β€” action to stop recurrence on future lots.]  
d) Evidence and due date: [Factory to complete β€” provide evidence that fits the finding, such as photos of affected/reworked units, sorting/rework record, re-inspection record, revised work instruction or training record where relevant; due 7 November 2026.]

Critical: none.

Shipment / acceptance stays on hold until CAPA evidence is accepted. Please reply by 7 November 2026 using the table below. Complete the blank cells.

| Finding # | Root cause | Corrective action | Preventive action | Evidence | Owner | Due |
|---|---|---|---|---|---|---|
| 1 |  |  |  |  |  | 7 November 2026 |
| 2 |  |  |  |  |  | 7 November 2026 |
| 3 |  |  |  |  |  | 7 November 2026 |

Regards,  
Jordan Lee  
Acme Imports LLC

---

**Internal checklist β€” before clearing PO-2026-1188 / SKU MUG-12-WHT**

- [ ] **Finding 1 β€” Major handle stitch open >5mm:** Require re-pull / re-inspection of handle stitch after factory correction. Clear only if result meets the recorded AQL plan.
- [ ] **Finding 2 β€” Major wrong carton barcode vs packing list:** Require re-pull of cartons and verification that carton barcode matches the packing list. Review correction evidence.
- [ ] **Finding 3 β€” Minor light scratch on matte glaze:** Require re-pull / re-inspection of matte glaze after sorting or rework. Clear only if result meets the recorded AQL plan.
- [ ] **Critical:** None from the failed list.
- [ ] Keep shipment / acceptance on hold until CAPA evidence is accepted and all three verification items are closed.

How to use it

Works in ChatGPT, Claude, Gemini and DeepSeek. Paste the failed AQL lines and get a formal CAPA request with root cause / corrective / preventive / evidence columns β€” different from a casual sample-feedback note.

Operational quality wording only; not legal advice. It will not invent defect codes or standards you did not include.

Test log

Date (UTC)ToolModelRunResultChecksTokens in / out
Nov 3, 2026Geminigemini-flash-latestTestPassed
3/3
  • βœ“ non-empty output (4274 chars)
  • βœ“ length usable (200–4000 words) (669 words)
  • βœ“ no obvious api key leak
0 / 0
Nov 3, 2026DeepSeekdeepseek-flashTestPassed
3/3
  • βœ“ non-empty output (3891 chars)
  • βœ“ length usable (200–4000 words) (642 words)
  • βœ“ no obvious api key leak
671 / 5,323

Each row is a real run recorded by our test runner. For each tool, the latest test run decides whether it appears under β€œTested on”. Baseline runs do the same task with no skill installed and never count.